Case Details
Clients: Vanguard MFG Group
Date: November 2025
Tags: Structured Cabling, Physical Security, Office Tech
Project Duration: 5 Weeks
Download a detailed report on this case
Ready to Secure Your Infrastructure?
Partner directly with our lead IT architects to audit your systems and secure your digital assets.
Working Time
The Story
Vanguard MFG Group had recently acquired a sprawling 50,000-square-foot facility to serve as their new corporate headquarters and distribution center. However, the building’s existing physical IT infrastructure was completely obsolete. The legacy cabling was degraded, causing massive network bottlenecks, there was zero wireless coverage on the warehouse floor, and the facility lacked a modern security camera and access control system. They needed a complete, ground-up physical technology overhaul before their hard move-in deadline.
The Lyttix Solution
We engineered a comprehensive physical infrastructure deployment, managing everything from the low-voltage wiring to the final camera positioning.
The Results
The deployment transformed an outdated warehouse into a highly secure, technologically advanced corporate facility on schedule.
Customer Reviews of the Case
